What the work covers
- Survey of both sites, including access, floor loadings and services
- A sequenced move plan built around your shutdown or changeover window
- Decommissioning, dismantling and marking at the outgoing site
- Transport, including out-of-gauge loads and escorts where required
- Reinstallation, levelling and alignment at the receiving site
- Support to your engineers through recommissioning and first-off production
Building the plan around downtime
Nearly every relocation we quote comes with a fixed window — a bank holiday weekend, a summer shutdown, a changeover between contracts. We work backwards from the date the line has to be running again, identify the moves that sit on the critical path, and put the contingency where it will actually be needed. Where a phased move keeps part of the plant producing throughout, we will price that as an option.
Moving within a building
Not every relocation involves a truck. Reconfiguring a floor, pulling a cell into a new layout or making room for a new line is the same discipline over shorter distances, and it is usually done around live production on the other side of the aisle.
- Based
- Cork, Ireland
- Serving
- Island of Ireland & EU-wide
- Since
- 1987
- Office
- (021) 430 7953
- Mobile
- 087 266 6665
Related
Usually part of the same job
Machine removal and dismantling
Whether the machine is going back on a truck, into storage, or out as scrap changes how we take it apart. Tell us the destination and we will work back from it.
Read more SVC / 01Machine installation
Getting a machine off the truck is the easy part. Getting it through the building, onto the right slab and level to the tolerance the manufacturer asks for is the job.
Read moreTell us what has to move.
Send the machine, the weight if you know it, where it is now and where it needs to be. If it is easier, ring and talk it through — most jobs are clear within a few minutes on the phone.